Case Study

Western Power CBD

LOCATION

363 Wellington Street, Perth CBD

PROJECT SCOPE

Construction Scaffolding

CLIENT

Duratec

OVERVIEW

Specialist contractors Duratec turned to Scafwest to supply an access scaffold to enable them to carry out a a scope of works to the western façade of the Western Power head office.

THE CHALLENGES

The building is 13 stories, 56-metres high and in a condensed CBD location. There was limited space available to erect scaffolding given the proximity to adjoining buildings and a very narrow thoroughfare.

Importantly, Western Power staff and visitors needed to safely gain access carried, especially to the car park at the back of the building, whilst the works were being carried out.

THE OUTCOME

With the safety of the public, our client’s workforce, and our own people, of paramount importance, the solution we designed was innovative, met or exceeded all due diligence requirements and was delivered on time and to Duratec’s exacting specifications.