Case Study

Enviro infrastructure on behalf of PTA (Perth Transport Authority)

LOCATION

Perth train station platform 6

PROJECT SCOPE

ScafWest was engaged to create handrail protection for the temporary escalator works on the platform

CLIENT

Enviro infrastructure on behalf of PTA

OVERVIEW

ScafWest was engaged to create handrail protection for the temporary escalator works on the platform at a Perth train station We built during night shift to complete the project.

The Challenges

In some of the projects we work on, there is an element of risk associated. At the PTA, scaffolding was built in 3m tower stages and tied progressively to eliminate material over 4m in length whilst coming into contact with live power.

THE OUTCOME

The project was completely built in 1 night which meant that our client was able to commence their repair works straight away.