LOCATION
Perth train station platform 6
PROJECT SCOPE
ScafWest was engaged to create handrail protection for the temporary escalator works on the platform
CLIENT
Enviro infrastructure on behalf of PTA
OVERVIEW
ScafWest was engaged to create handrail protection for the temporary escalator works on the platform at a Perth train station We built during night shift to complete the project.
The Challenges
In some of the projects we work on, there is an element of risk associated. At the PTA, scaffolding was built in 3m tower stages and tied progressively to eliminate material over 4m in length whilst coming into contact with live power.
THE OUTCOME
The project was completely built in 1 night which meant that our client was able to commence their repair works straight away.