Project

Narrows Bridge

LOCATION

Perth CBD

PROJECT SCOPE

Infrastructure Scaffolding

PROJECT DESCRIPTION

Required a Platform suspended from above and cantilevered to attaché carbon strengthening. The platform followed the curvature of the bridge